All objects

INDUSTRIAL PARK RADNEVO is located in Radnevo, Radnevo Municipality, Stara Zagora Province, at 1 Zavodska Street. The central and three auxiliary entrances to the park are located on the main road of Radnevo, immediately before the exit from the town in the direction of Nova Zagora. The park has its own well-developed industrial railway network and its own railway track connecting it to Radnevo railway station. The park's objective is to lease buildings for metalworking, produce electricity from renewable energy sources, and lease or sell land and buildings for construction. The park's objective is to lease buildings for metalworking, produce electricity from renewable energy sources, and lease or sell land and buildings for construction.

The purpose of the park is to lease buildings for metalworking, renewable energy production, and to lease or sell land and buildings for the construction and operation of other high-tech manufacturing, warehousing and logistics activities, training, qualification, and retraining of personnel. RADNEVO INDUSTRIAL PARK is a Type A – general park, with no specialisation in production activities. An industrial building complex for the repair of wagons and locomotives has been preserved, with suitable industrial railway infrastructure and transhipment facilities. The tasks are to meet the needs for the production of large-scale metal structures and metal products for Bulgarian and foreign customers, the production and repair of electrical equipment, the development of light industry production activities, warehousing and logistics activities, which can be solved individually or as a whole with the proposed industrial complex.

Translated with DeepL.com (free version)

Regions

Stara Zagora

Municipalities

Radnevo

City

Radnevo

Address

1 "Zavodska" Str., Radnevo town, Radnevo Municipality, Stara Zagora Region

Eligible activities

Production and warehouse activities

Owner

Bulmarket Group AD, UIC 206523909

Ownership

Private property

Company Ownership

Private property

Electricity

Capacity

9000 KW

Water supply

Yes

Own boreholes and connection to Radnevo Water Utility

Sewage

Yes

Gas

No

Greenfield

Yes

Transport

Trakia Motorway

19 km

Own railway track to Radnevo railway station available

2.5 km

Logistics

Internal factory roads

Renewable

No

Labor market

Unemployed persons

5 442.00

As of 31 December 2024

Unemployment rate

4,28%

As of 31 December 2024

Labor force (thousands)

131,4

As of 31 December 2024

Economic activity coefficient

75,2%

As of 31 December 2024

Average annual salary

11 140.23EUR

As of 31 December 2023

Population

288 736.00

As of 31 December 2024

Employed persons (thousands)

125.9

As of 31 December 2024

Occupancy rate

72%

As of 31 December 2024

Educational institutions

Higher education institutions

1

As of 31 December 2024

Enrolled students

6 035.00

As of 31 December 2024

Graduated students

1 190.00

As of 31 December 2024

Source of information

Employment Agency

Published on: 20.10.2025